This effort included the front-end engineering, detailed design, and on-site construction support for a complete winder replacement. A new winder was installed as well as the associated safety gating and light curtains, control room, motors, and drives. The design included all engineering disciplines. Safety gate and roll handling modifications, including new conveyors, bander, labeler, and kickers were made to allow the winder to integrate with the existing roll handling system. Piling and additional structural columns were added to support the new winder. A new trim fan system and ducting were installed as well as HVAC for both the new control room and the existing electric center where the drive lineups were installed. A new MCC lineup was installed to feed the new air compressor system as well as the new hydraulic system.