The Isomer design included civil engineering services to provide the necessary engineering documents required for permitting and constructing the $60 million 50MW-DC solar facility located on 365-acres in Idaho. Deliverables included a stormwater management report, Stormwater Pollution Prevention Plan (SWPPP) report, permit and construction drawings, specifications, and as-built drawings. In addition to detailed design and construction support, Isomer supported the contractor by analyzing the anticipated torque tube height and slope to ensure the racking parameters were met and generating the post-count quantities required for each specified size. As part of the project, Isomer successfully value-engineered the placement of the PV arrays to limit the extent of grading and requirement for larger piles.